| Planning size heuristics | Essentials only: 5 W/sq ft with a 10 kW floor; Most of the home: 7 W/sq ft with a 14 kW floor; Whole-home comfort: 9.5 W/sq ft with a 18 kW floor. Output is rounded to 2 kW steps and capped at 48 kW. | External reference + internal planning assumptionThe source supports professional sizing and variable project scope; the watts-per-square-foot rules and floors are internal planning heuristics, not an electrical load calculation. | Generac↗Reviewed 2026-08-05 · Model 2026.08 |
|---|
| Generator equipment allowance | Fixed $1,350 / $1,800 / $2,300 plus $155 / $205 / $250 per kW | External reference + internal planning assumptionRetail listings and the broad installed range calibrate the band; the linear formula is an internal interpolation and does not reproduce a retailer price list. | The Home Depot↗Generac↗Reviewed 2026-08-05 · Model 2026.08 |
|---|
| Transfer-switch allowance | Automatic: $1,200 / $2,200 / $3,200; Manual: $500 / $900 / $1,500 | External reference + internal planning assumptionThe references support switch types and retail context; installed low, typical, and high allowances are internal planning values. | The Home Depot↗The Home Depot↗Reviewed 2026-08-05 · Model 2026.08 |
|---|
| Electrical installation allowance | Fixed $1,700 / $2,600 / $3,200 plus $30 / $55 / $60 per kW | External reference + internal planning assumptionThe source supports electrical work as part of installation; the fixed and per-kW values are internal planning assumptions. | Generac↗Reviewed 2026-08-05 · Model 2026.08 |
|---|
| Fuel-system allowance | Natural gas: base $400 / $800 / $1,100; per foot $12 / $22 / $30; Propane: base $1,600 / $2,600 / $4,200; per foot $10 / $18 / $30; Diesel: base $2,400 / $3,600 / $5,600; per foot $8 / $14 / $22 | External reference + internal planning assumptionThe source supports fuel type, route, and site conditions as cost drivers; fuel base and per-foot bands are internal and do not size pipe, regulators, tanks, or utility service. | Generac↗Reviewed 2026-08-05 · Model 2026.08 |
|---|
| Site-preparation allowance | Existing level base: $150 / $350 / $700; New standard pad: $550 / $950 / $1,600; Complex site: $1,400 / $2,500 / $4,500 | External reference + internal planning assumptionThe source supports site conditions as a cost driver; the three site bands are internal allowances and do not determine setbacks, drainage, anchoring, or excavation scope. | Generac↗Reviewed 2026-08-05 · Model 2026.08 |
|---|
| Permits and inspection allowance | $250 / $550 / $900 | External reference + internal planning assumptionThe source supports permitting as part of the project; the band is internal because permit types and fees are local. | Generac↗Reviewed 2026-08-05 · Model 2026.08 |
|---|
| Optional service-panel work | $1,800 / $3,200 / $5,200 | Internal planning assumptionThis is an explicit contingency for upgrade or corrective work discovered during inspection, not a sourced national panel-upgrade price. | No external price source claimedReviewed 2026-08-05 · Model 2026.08 |
|---|
| State labor-sensitive multiplier | 50 internal state factors ranging from 0.87× to 1.28×; equipment is not multiplied. | External reference + internal planning assumptionThe references support location, regional price levels, and wages as relevant context. The broad generator-project factors remain internal assumptions: they are not BEA indexes, BLS wage conversions, contractor bids, or statements of current local market prices. | Generac↗U.S. Bureau of Economic Analysis↗U.S. Bureau of Labor Statistics↗Reviewed 2026-08-05 · Model 2026.08 |
|---|
| Displayed price rounding | Every line and total is rounded to the nearest $10. | Internal planning assumptionRounding communicates planning-level precision and prevents formula output from appearing quote-exact. | No external price source claimedReviewed 2026-08-05 · Model 2026.08 |
|---|