Generator Wattage Worksheet
The running-watts plus single-largest additional-starting-watts worksheet method and selected household planning defaults.
Free planning tool Model 2026.08
Use this whole house generator sizing calculator to choose the loads that must run during an outage, replace planning values with nameplate watts, and see the complete calculation behind the recommended standby-generator tier.
Interactive load worksheet
02 A better square-foot answer
The honest answer is a load plan, not one universal number. These three examples keep the house size fixed and change only what must operate together. They use the same formula and 20% buffer as the calculator above.
| Outage plan | Selected running | Largest extra start | With 20% buffer | Planning tier |
|---|---|---|---|---|
| Essentials onlyLights, outlets, refrigeration, internet, security, and a gas-furnace blower. | 3,650 W | 2,350 W | 7,200 W | 10 kW |
| Managed comfortEssentials plus a sump pump and microwave, with large loads used selectively. | 6,200 W | 2,350 W | 10,300 W | 14 kW |
| Broader whole-home planManaged comfort plus a central-air planning load, before any electric heat or EV charging. | 9,700 W | 7,000 W | 20,100 W | 22 kW |
Central air, wells, electric heat, water heating, ranges, dryers, and EV charging can move the result quickly. Load management may keep some large appliances out of the simultaneous total. Fuel type and site conditions can also change a generator's usable output.
03 Visible calculation
Count the loads expected to operate at the same time.
Use the largest additional motor-start requirement, not every startup value combined.
The default 20% buffer can be changed; it is a budgeting assumption, not an electrical-code rule.
The worksheet chooses the first standard planning tier that is not below the rounded requirement.
Σ running W+largest extra start W+buffer
04 Work offline
Use the formula-driven workbook during equipment inventory or contractor conversations. Yellow cells are editable; formulas calculate selected running load, the largest additional starting load, buffer watts, and the next planning tier.
Download the Excel worksheetSizing Worksheet20 editable rows + live summary
Assumptions & SourcesTier lookup + evidence boundaries
Formula-driven · 11 KB · Reviewed 2026-08-05
05 Evidence boundary
Manufacturer material supports the worksheet sequence and selected example loads. Values labeled as internal planning allowances are bounded placeholders and should be replaced with equipment data for a real project.
The running-watts plus single-largest additional-starting-watts worksheet method and selected household planning defaults.
Adding the largest starting requirement to simultaneous running loads and retaining planning headroom.
A 20% planning buffer and the importance of selecting the household loads that must operate during an outage.
This result is not a contractor quote, electrical design, or equipment-selection approval. Final sizing must account for actual nameplates, motor-start characteristics, fuel-specific ratings, transfer equipment, conductors, load management, site altitude and temperature, and applicable local requirements.
Already know the kW? Build an installed-cost estimate →06 Plain-language answers
Use the answers to plan the worksheet—not to replace a project-specific load calculation.
Square footage does not determine generator size by itself. In this planning model, selected essentials produce a 10 kW tier, managed comfort loads produce 14 kW, and a broader plan with central air produces 22 kW. Actual equipment, fuel rating, and simultaneous loads can change the answer.
It adds all selected running watts, then adds only the largest single additional starting requirement. It applies the selected planning buffer and rounds up to the next supported standby-generator tier.
Not in this worksheet method. It assumes the largest motor startup is the controlling additional load rather than every motor starting simultaneously. A project with unusual sequencing or multiple simultaneous starts needs project-specific review.
Yes. The downloadable workbook contains editable load rows, formulas for running and starting watts, an adjustable buffer, a standard-tier lookup, and a separate assumptions-and-sources sheet.
No. It is an early planning worksheet for comparing outage priorities and budget scenarios. A qualified local professional must verify equipment nameplates, fuel-specific output, transfer equipment, conductors, load management, and applicable requirements.