What size generator do I need?
Start with the loads that must operate together, add the largest single additional motor-start requirement, apply visible headroom, and round up to a supported tier. The published examples on this page produce 10 kW for essentials, 14 kW for managed comfort, and 22 kW for a broader plan with central air; they are load-plan examples rather than universal house-size answers.
What size generator for a 200 amp service?
A 200-amp service rating is not a generator-size input. It describes the home's service capacity, not the smaller group of outage loads that must operate together. Inventory those loads, include motor starting demand, then review transfer equipment and load management for the actual project.
What size generator does a 2,000-square-foot house need?
Square footage does not determine generator size by itself. In this planning model, selected essentials produce a 10 kW tier, managed comfort loads produce 14 kW, and a broader plan with central air produces 22 kW. Actual equipment, fuel rating, and simultaneous loads can change the answer.
What size generator does a 3,000-square-foot house need?
A 3,000-square-foot house does not have one dependable generator size. Floor area can suggest that more loads may exist, but the calculation still depends on which heating, cooling, water, pump, cooking, and other loads must run together. Use the same load worksheet and replace planning values with equipment data.
What size generator is needed to run central air?
Central air must be evaluated with the other simultaneous loads and the compressor's starting demand. The page's bounded 3-ton-class placeholder contributes 3,500 running watts and 7,000 additional starting watts; in the published broader whole-home example, the complete load plan reaches a 22 kW planning tier. Actual condenser data, soft-start equipment, fuel rating, and load management can change the result.
How does the generator sizing calculator handle starting watts?
It adds all selected running watts, then adds only the largest single additional starting requirement. It applies the selected planning buffer and rounds up to the next supported standby-generator tier.
Should I add every appliance's starting watts together?
Not in this worksheet method. It assumes the largest motor startup is the controlling additional load rather than every motor starting simultaneously. A project with unusual sequencing or multiple simultaneous starts needs project-specific review.
Can I use the Excel generator sizing worksheet offline?
Yes. The downloadable workbook contains editable load rows, formulas for running and starting watts, an adjustable buffer, a standard-tier lookup, and a separate assumptions-and-sources sheet.
Is this an electrical load calculation?
No. It is an early planning worksheet for comparing outage priorities and budget scenarios. A qualified local professional must verify equipment nameplates, fuel-specific output, transfer equipment, conductors, load management, and applicable requirements.